Description of work |
Client |
Year |
|
Prai Power Station - Seberang Perai |
Swift Trillion Sdn Bhd / |
2002 |
|
Hicom Sand Plant Facilities - Shah Alam |
Disa India Limited |
2004 |
|
EPCC Project - Putrajaya |
PTT-OLEA JV Pitechnic (M) Sdn Bhd |
2004 |
|
Sabah Forest |
Sabah Forest Industries Sdn Bhd |
2004 |
|
PD-1 GTG Stator replacement- Port Dickson |
Swift Trillion Sdn Bhd / Mitsubishi Heavy Industries |
2004 |
| Tanjung Bin - Johor Fabrication of embeded plate, condenser template |
Swift Trillion Sdn Bhd | 2004 |
| Pyrolyis - Machap Reinstallation of Pyrolyis Plant at Machap Aswiatic Plantation |
PC Installation & Contracting Sdn. Bhd. | 2005 |
| NEGM-M3-6 Line Project Installation of Press Machine M3-6 treatment, Transfer Facility and C/E |
Toyo Engineering Sdn Bhd | 2005 |
| Goldent Hope Harvic - Prai PVC injection machine installation at Golden Hope Harvic, Prai |
Kejuruteraan Letrik Seri (M) Sdn Bhd | 2005 |
| TIPP - AMP-PE Project Mechanical and Epuipment installation at TIPP Senawang |
Algotech (M) Sdn. Bhd |
2006 |
| M-11T Process and after process line Fabrication and installation of Batch Plant and AP line |
Toyo Engineering Sdn Bhd | 2006 |
| M-11T-2 Batch Plant and AP line Fabrication and Installation of Omi Glass Fiber Mixing Batch Plant and AP line at NEGM Shah Alam (Nippon Electric Glass) |
Toyo Engineering Sdn Bhd | 2006 |
| PD2 Power Plant - Port Dickson Gas Turbine and Generator installation at PD2 Power Plant |
Swift Trillion Sdn Bhd / TPK Malaysia | 2007 |
| M1 - T WGT Plant Fabrication and installation of WGT Equipment of Discharge Gas Treatment System at Nippon Electric Glass |
Toyo Engineering Sdn Bhd | 2007 |
| MB Batch Plant - NEG Chain scrapper, chute, hopper repair and modification work |
Toyo Engineering Sdn Bhd | 2007 |
| M1-T OMI Glass Fiber Mixing Plant and After Process Line Fabrication and installation of OMI glass fiber mixing and after process plant at Nippon Electric Glass Shah Alam |
Toyo Engineering Sdn Bhd | 2007 |